The Port Authority of Douala and its private partner, Douala Port Power Corporation, signed an agreement on 16 November with a Chinese consortium led by Genertec CMC, with China Energy, to build a 300-megawatt gas-fired power plant at the port. The first phase, costing about $670 million (397 billion CFA francs), covers a 102-megawatt unit and a 200-kilometre gas pipeline from Kribi via Edéa. The 25-year build-operate-transfer concession dates from September 2025, and construction, first planned for March 2026, still has no start date. The plant would end outages that disrupt Cameroon’s main port and sell surplus power to Douala’s grid, but its lenders and gas supplier remain unnamed.
Energy & Industry · Tags: Cameroon, Port Authority of Douala, Douala Port Power Corporation, Genertec CMC, China Energy
Sources
- Ecofin Agency: https://www.ecofinagency.com/news-infrastructures/1711-60863-cameroon-douala-port-plans-300-megawatt-gas-plant-in-two-phases
- Business in Cameroon: https://www.businessincameroon.com/construction/1711-17199-douala-port-taps-chinese-group-for-gas-plant-to-end-outages
- Journal du Cameroun: https://en.journalducameroun.com/douala-autonomous-port-construction-of-a-628-billion-fcfa-power-plant-announced-for-march-2026/